Explore projects by scope, including turnkey work, sitework, land clearing, tiltwall and commercial concrete. Each project has its own scope overview and construction gallery.

Porter Storage
Porter, Texas
- Turnkey
- Sitework
- Concrete
- Underground Utilities
- Foundations
- Drainage
Enclosed RV storage development at 22341 FM 1314. The reference documents Phase 1 completion in May 2023, with detention pond hydroseeding assistance following completion.
View project and construction photos
Conroe Waterfront
Conroe, Texas
- Turnkey
- Sitework
- Concrete
- Land Clearing
- Underground Utilities
- Soil Stabilization
- Drainage
Phase 1 site development at FM 3083 and I-45, including restaurant building pad preparation for an incoming Cheddar’s. The gallery includes site preparation photography and the civil plan.
View project and construction photos
Forest Park Funeral Home
12650 Shadow Creek Parkway
- Concrete
- Turnkey
- Foundations
The reference identifies this project as turnkey concrete construction and includes takeoff information, foundation work and aerial imagery. This photograph shows the developed site; quantities are omitted here pending transcription review of the takeoff.
View project and construction photosShady Acres Church
13100 Kuykendahl Houston, TX.
- Sitework
- Land Clearing
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
- Turnkey
New Construction – 9.5 Acre Land Clearing, Sitework Cut/Fill, 1560 LF Underground, Storm, 921 LF Water/Fireline, 401 LF Sanitary, 20,518 SF @ 6” Concrete Foundation, 52,135 @ 6” Parking, 52, 135 SF Lime Stabilization, 19,159 SF @ 5” Parking, 13,222 SF Sidewalks and 3500 LF @ 6” Curb.
View project and construction photosBishop Square Retail
14914 Mueschke Rd. Cypress, TX 77433
- Foundations
- Concrete
New Construction – (8) 6” Concrete Building Foundations Totaling 47,952 SF, 77,600 SF @ 6” Parking Area, 3535 SF 4 ½ “ Sidewalks and 2822 LF @ 6” Curb
View project and construction photos
Chevron C-Store Windsor Park – Richmond TX (Phase-1)
13802 FM 1464 Richmond TX 77407
- Sitework
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
New Construction: Sitework Cut/Fill, Lime Stabilization, Underground Storm, 7700 SF 6” Concrete Foundations & 46,300 SF 5” Parking Area & 9083 SF Sidewalks
View project and construction photosCottingham RV Park
4858 S. Sam Houston Pkwy E. Houston, TX. 77048
- Concrete
New Construction – 179,000 SF @ 7” Concrete Driveways, 16,319 @ 11” Public Road ROW, 9360 SF @ 4” Sidewalk, 3571 LF Private Curb & Gutter, 1073 LF Public Road Curb & Gutter
View project and construction photosCross Creek Plaza
27017 Fulshear Bend Dr. Fulshear TX. 77441
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
New Construction – (3) Concrete Retail Building Foundations totaling 27,080 SF, 87,683 SF 6” Parking Area, 87,683 SF Lime Stabilization, 4964 @ 4” Sidewalks, 5077 @ 6” curbs, 1358 LF Underground Storm, 760 LF Water/Fireline and 640 LF Sanitary
View project and construction photosElite Dermatology
Fulshear Bend in Fulshear TX
- Sitework
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
New Construction – Sitework, 928 LF Underground Storm, 855 LF Water/Fireline, 280 LF Sanitary, 12,900 @ 6” Concrete Foundation, 47,113 SF @ 6” Parking Lot Concrete, 47,113 SF Lime Stabilization, 3424 @ 4 ½” Concrete Sidewalks and 2701 LF @ 6” Curb
View project and construction photosIAH George Bush Airport (City of Houston) Regional Detention Pond
191 Standifier Humble, TX 77338
- Concrete
- Drainage
New Construction – Offsite Trucking To Haul Off 100,000+ CY Excavation Dirt Export, 58,000 SF Concrete Pilot Channels, 14,590 SF Sloped Concrete Weir & 700 SF Concrete Backslope Interceptors
View project and construction photosNorthfield Residential Development
7923 Ludington Houston, TX.
- Sitework
- Land Clearing
- Underground Utilities
- Demolition
- Drainage
40 Acre Land Clearing, Phase-1 Sitework Cut/Fill Approximately 436,524 CY, 4909 LF Underground Storm Demo & Replace
View project and construction photos
Sedona Lakes – Manville TX
4626 County Rd 94, Manvel, TX 77578
- Sitework
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
New Construction: Sitework Cut/Fill, Lime Stabilization, Underground Storm, Concrete (2) Foundations & Flatwork NOTE: Included change order for additional dirt work due to issues with Sitework Sub
View project and construction photosPorter Business Park (Phase-2 -In Progress)
Fatheree Drive at FM 1314 in Porter TX
- Sitework
- Underground Utilities
- Soil Stabilization
- Foundations
- Concrete
- Drainage
New Construction –Sitework 17,454 CY Cut & Fill, Import 15,982 CY, 2880 LF Underground Storm, 1620 LF Water, 1456 LF Sanitary, 39,621 SF Lime Stabilization, (10) Concrete Foundations totaling 100,370 SF & Approximately 39,241 SF Concrete Parking Area and 1854 SF Sidewalk.
View project and construction photos
Shell On The Go Tomball TX
15215 Farm to Market 2920, Tomball, TX 77377
- Sitework
- Underground Utilities
- Foundations
- Concrete
- Drainage
Sitework, Underground Storm, Concrete Foundations & Flatwork
View project and construction photosSpring Creek Dentistry
17625 Stuebner Airline Road Spring, YTX 77379
- Underground Utilities
- Foundations
- Retaining Walls
- Drainage
Renovation –Add Surgery Wing Foundation Expansion to Existing Foundation, Expand Parking Area & Detention, Add Vertical Retaining Wall) and expand & Tie-In Underground Storm.
View project and construction photosTaco Bell Conroe 242
10280 Highway 242 Montgomery County TX
- Concrete
Renovation – Concrete Drive Through, Sidewalk & General Flatwork
View project and construction photos
Truck Stop in Channelview TX
- Sitework
- Underground Utilities
- Foundations
- Concrete
- Drainage
Sitework (Cut 2669 CY/Fill 9746 CY – Import 7077 CY), Underground Storm (210 LF 42” HDPE, 277 36” HDPE, 73 LF 30” HDPE, 1296 LF 24” HDPE, (1) C-Store 6000 SF @ 6” Concrete Foundation & (1) 5200 SF @ 6” Retail Building Foundation, 112,703 SF of 7” Concrete for HD Parking, 32363 SF 6” SD Parking and 1630 LF of 6” Curb
View project and construction photosTaco Bell Taylor Road
ENTER ADDRESS
- Underground Utilities
- Foundations
- Concrete
- Drainage
Renovation – 2100 SF Concrete Foundation, 1732 SF Concrete Drive-Thru, 1042 SF 4” Sidewalks, 260 LF 6” Curb, 160 LF 5’x3’ Box Culvert Underground Storm, 220 LF HDPE Storm, 2 Manholes, 2 Catch Basins.
View project and construction photosWaco Land Clearing
Waco TX
- Land Clearing
110 Acre Land Clearing (Onsite Burn)
View project and construction photos